there will be no field jobs left. only field machines. 🙂
Cross-country remote-cabin operation of construction machinery has already been done in China. Some claims to have done from 2,000 km away, with end-to-end control delay under 30 ms.
野外作业岗位将不复存在。只剩野外机器。🙂 中国已实现工程机械的跨省远程座舱操控。有说法称已从 2,000 公里外完成操作,端到端控制延迟低于 30 ms。
野外作业岗位将不复存在。只剩野外机器。🙂 中国已实现工程机械的跨省远程座舱操控。有说法称已从 2,000 公里外完成操作,端到端控制延迟低于 30 ms。
there will be no field jobs left. only field machines. 🙂
Cross-country remote-cabin operation of construction machinery has already been done in China. Some claims to have done from 2,000 km away, with end-to-end control delay under 30 ms.
来源:Rohan Paul· x.com